★ Material is stainless steel
★ Excellent fitment and easy installation
★ Strict quality control during the process
★ Professional design
★ shortest time for production and soonest delivery
★ Two year warranty
★ Highly inspected before shipping
★ Delivery on time and best after-sales service
Now our main business production line concluded Auto parts with ceramics , Steel car exhaust, and Diesel particulate filters ceramics,refractory ceramics such as casting ceramics and so on .Also we have different material for ceramics ,such as cordierite/aluminum/silicon carbide/Zircornia.To meet the demands of our customers better, we offer innovative and customized products and services to all of our customers from all over the world, helping them to achieve the goal of continued revenue growth,energy saving and environment protection.
With the predominance of Honesty, Efficiency and Innovation, we will satisfy global client's market requirement.We welcome new and old customers from all walks of life to contact us for future business relationships and achieving a mutual success.
Carfitment | ||||
OE NO. | Car Fitment: | Mold | Year: | |
2851026800 | KIA (DYK) RIO | 1.4 1.6 |
2007-2014 | |
Product name | KIA (DYK) RIO | |||
Model Number | DJN501 | |||
Brand Name | DJN | |||
Emission Standard: | EURO 2/3/4/5 | |||
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat | |||
Shell :304 or 409 # stainless steel shell,stainless steel pipe | ||||
Oxygen sensor ports | Yes | |||
cpsi | 400 /600/800 | |||
Wall thickness | 0.09±0.025 | |||
Warranty | 30000 miles performance/2 years | |||
Packaging: | Air bubble film and Carton Packing | |||
MOQ: | 50 pcs | |||
Supply Ability | 1000 Piece/Pieces per Week | |||
Place of Origin: | Jiangsu | |||
SAMPLE ORDER: | Accept | |||
Condition | new | |||
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; | |||
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted | |||
Supply Ability | 1000 Piece/Pieces per Month | |||
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material | |||
Port | Shanghai/Ningbo | |||
Lead time: | 10-30 days . | |||
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements | |||
Shape | round, oval, race track |